2004

2004

The metal forms in the foreground are welded together to make cans of varying length. The tubes are set into the silt and hammered down to rest on bedrock. Templates (the girder structures in the background) are used to position the tubes precisely, for both horizontal alignment and vertical plumb.

[Background] [Editing] [Affiliates] [Photography] [Articles] [Personal] [Inquiry Form]




Page last updated 8/22/2005