2004

2004

Once the shaft is drilled, this rebar cage is lowered into position and encased in concrete. The tubes projecting out of the end are used to sonically test the integrity of the concrete throughout its length across the diameter.

[Background] [Editing] [Affiliates] [Photography] [Articles] [Personal] [Inquiry Form]




Page last updated 8/22/2005